Contact: Tanya Branton, (850) 330-1599, Tanya.branton@dot.state.fl.us
Chipley- Drivers will encounter traffic disruptions on the following state roads in Escambia and Santa Rosa counties as crews perform construction and maintenance activities.
Escambia County:
- U.S. 29 Widening from Interstate 10 (I-10) to U.S. 90 (Nine Mile Road) – The following traffic impacts will occur Sunday, Dec. 9 through Saturday, Dec. 15. Work requiring lane restrictions will take place from 8 p.m. to 6 a.m.
- Nine Mile Road at the U.S. 29 Overpass: Alternating traffic shifts will direct all traffic onto the westbound or eastbound lanes as crews continue construction of the new northbound bridge deck. Nine Mile Road lane restrictions are Sunday through Friday.
- U.S. 29 between I-10 and 9 1/2 Mile Road: Drainage and paving operations continue. Drivers can expect alternating lane closures Monday through Saturday.
- U.S. 98 Pensacola Bay Bridge Replacement – Construction activities continue. Drivers will encounter alternating lane closures between 14th Avenue in Pensacola and Bay Bridge Drive in Gulf Breeze from 8 p.m. to 5 a.m. Sunday, Dec. 9 through Sunday, Dec. 16.
- U.S. 98 (Lillian Highway) Resurfacing from the Perdido Bay Bridge to Dog Track Road – Paving operations continue from the Perdido Bay Bridge to Dog Track Road. Lane closures will be in effect from 8 p.m. to 5:30 a.m. Sunday, Dec. 9 through Sunday, Dec. 16.
- U.S. 98 (East Chase Street) Resurfacing from North Palafox Street to Bayfront Parkway - There will be paving operations from Palafox Street to the I-110 ramps from 9 p.m. to 6 a.m. Monday, Dec. 10 through Sunday, Dec. 16.
- Crary Road Bridge Replacement - Crary Road will be temporarily closed between Tedder Road and Byrneville Road as crews construct a bridge culvert. Motorists will be detoured via County Road (C.R.) 4 and Byrneville Road.
- Bratt Road Bridge Replacement over Canoe Creek - Bratt Road will continue to be closed near Canoe Creek during construction. Drivers on Bratt Road, west of the bridge, will be detoured to Pine Barren Road and C.R. 4. Drivers east of the bridge will be detoured east on Bratt Road.
- S.R. 727 (Fairfield Drive) Drainage Improvements from south of Usher Circle to north of Hestia Place- The south entrance to Usher Circle from Fairfield Drive will be closed to traffic from Tuesday. Dec. 11 through Friday, Dec. 14 as crews install pipe across the roadway. Those seeking access to Usher Circle may utilize the north entrance off Fairfield Drive.
All activities are weather dependent and may be delayed or rescheduled in the event of inclement weather. Drivers are reminded to use caution, especially at night, when traveling through a work zone and to watch for construction workers and equipment entering and exiting the roadway.
For more information visit the Florida Department of Transportation District Three on the web at www.nwflroads.com, follow us on Twitter @myfdot_nwfl, or like us on Facebook at www.facebook.com/MyFDOTNWFL.